March 2021 – Belvoir Castle at Uttara
| |
---|
Name of the work | Progress details |
Foundation work | 100% Complete |
Super Structure work | 100% Complete |
Block work | 100% Complete |
Electrical conduit work | 100% Complete |
Door frame fitting work | 100% Complete |
Sanitary & plumbing line work | 100% Complete |
In side Plastering work | 100% Complete |
Electrical cable wiring work | 100% Complete |
Wall tiles work | 100% Complete |
Common sanitary & Plumbing line work | 100% Complete |
Outside plastering work | 100% Complete |
Floor tiles/Marble work | 100% Complete |
L.C.C work | 100% Complete |
Grill & Railing work | 100% Complete |
Inside paint & Polishing work | 100% complete. |
Switch -Socket fitting work | 100% complete. |
Outside paint work | 100% complete. |
Door shutter work | 100% complete. |
Aluminum/Glazing work | 100% complete. |
Tiles Pointing work & Marble finishing work | 100% complete. |
Commode - Basin fitting work and C.P fittings work | 100% complete. |
Lift/Generator /Substation /Solar work | 100% complete. |
Boundary wall /Ground floor development work | 100% complete. |
Roof top finishing work | 100% complete. |
Roof top Gardening work | 100% complete. Ready to Hand over. |