March 2021 – Rosarium, Malibag, Dhaka
| |
---|
Name of the work | Progress Details |
Foundation work | 85% Foundation work Completed. |
Super Structure work | G.Floor column casting-80% completed.G.Floor roof slab work(1st phase) ongoing. |
Block Work | |
Electrical Conduit work | |
Door frame fitting work | |
Sanitary & plumbing line work | |
In side Plastering work | |
Electrical cable wiring work | |
Wall tiles work | |
Stair railing & Verandah Railing work | |
Outside plastering work | |
Floor tiles feting | |
L.C.C work | |
Window Grill work | |
Marbel fitting work | |
Switch -Socket fitting work | |
Outside paint work | |
Door shutter work | |
Aluminum/Glazing work | |
Tiles Pointing work & Marble finishing work | |
Commode - Basin fitting work and C.P fittings work | |
Substation room work | |
Boundary wall /Ground floor development work | |
Roof top finishing work | |
Roof top Gardening work | |