Construction Status (May, 2018) – The Prestige, Hill View HS, Chittagong

                                                                          Construction Status

Serial No. Name of work Achievement for the month of April -2018 Program  for the month of May-2018
Target Achievement Target  
01 Switch, Socket fittings 10% 10%
02 Cat Door Fitting 50% 50%
03 Moulding Bit Fitting 50% 50%
04 Commode, Basin Fitting 50% 50%
05 Polish Work 50% 50% 50%
06 Door Stopper Fitting 50% 50%
07 P v c False ceiling Fitting 100% 100%
08 Ground Floor Tiles Fitting (Skirting & Column) 100% 100%
09 Column Guard Fitting (Basement & Ground Floor) 100% 100%
10 Railing Fitting (Machine Room & O.H.W.T Top) 100% 100%
11 Ground Floor Skirting Plaster 100% 100%
12 Pavement Tiles Fitting (Ramp Area) 100% 100%
13 Cable Wiring (Basement & Ground Floor) 100% 100%
14 Brick Work & Plaster (Basement) 100% 100%
15 Switch, Socket, M c b, & Light Shade Fitting (Basement & Ground Floor) 100% 100%
16 Circuit Breaker, Soccer light, Wall Bracket  Fitting(flat) 100% 100%
17 Paten Stone Work (Lift Machine Room & O.H.W.T Top) 100% 100%
18 Solar Panel Fitting 100% 100%
19 Reception Table Marble, Tiles Work 100% 100%
20 Main Floor Pointing Work 100% 100%
21 Ground Floor Skirting Plaster 100% 100%
22 Pavement Tiles Fitting (Ramp Area) 100% 100%
23 Cable Wiring (Basement & Ground Floor) 100% 100%
24 Brick Work & Plaster (Basement) 100% 100%
25 Circuit Breaker, Soccer light, Wall Bracket  Fitting(flat) 100% 100%
26 Paten Stone Work (Lift Machine Room & O.H.W.T Top) 100% 100%
27 Solar Panel Fitting 100% 100%
28 Reception Table Marble, Tiles Work 100% 100%
29 Main Floor Pointing Work 100% 100%
30 Final coat paint flat 100%
31 Lift lobby+lift wall+stair+rooftop tiles pointing 100%
32 Ground floor + basement pavement tiles pointing 100%
33 Boundary wall paint 100%
34 Guardroom  aluminum work 100%
35 Outside paint 2nd coat 100%
36 Ciramic cleaning 100%
37 Wooden ceiling paint work 100%
38 Rooftop & void area roofing compound 100%
39 Logo work 100%
40 Switch, Socket, M c b, & Light Shade Fitting (Basement & Ground Floor) 100%